Our Professionalism and Experience made us a strong reality in the metal-mechanic and pipings field, challenging us with high-complexity job requests both in Italy and abroad.
Thanks to our high-qualified staff, we're always able to quickly intervene on any type of projects based on the specific requests of our customers.
Home » Projects
Projects
PRESENT IN ITALY AND ABROAD
OUR PROJECTS
Ongoing Projects:
- CLIENTE - MAC IMPIANTI Srl - Metal modules Assembly in Baker Huges plant of Avenza (MS);
- CLIENTE - ITAL PROGETTI SPA (PI) – Pipings Assembly along with wielding operations for a new sewage treatment / waste water discharge system into Le Pouy en Velay (France);
- CLIENTE - ENERMAC - Chiller area Revamping; pre-manufacturing and pipings laying operations, moving of centrifugation pumps and hydraulic splitter; Manual Valves installations and metal pipings supports assembly inyo FIDIA Pharmaceutics in Abano Terme (PD);
- CLIENTE - NUOVA IMPRESA COSTRUZIONI MANUTENZIONI INDUSTRIALI SRL - Load - bearing structures assembly operations and sideshore jackets wielding into Saipem plant of Intermare Sarda Tortolì (NU);
Former 2024 Projects:
- CLIENTE - NUOVA IMPRESA COSTRUZIONI MANUTENZIONI INDUSTRIALI SRL – Pipings assembly and metal carpentry wielding into ENI Versalis factory (RA);
- CLIENTE - MAC IMPIANTI Srl - Pipings support assembly operations and metal carpentry wielding into SYCTOM Incinerator, Ivry Sur Seine (France);
Former 2023 Projects:
- CLIENTE - ENERMAC - Installazione di strumenti (Misuratori di Portata, Temperatura e Pressione), verniciatura tubazioni di Gas Naturale e Touch-Up Tubazioni Acqua torre presso lo stabilimenti FIDIA Farmaceutici sito ad Abano Terme; (PD)
- CLIENTE - NUOVA IMPRESA COSTRUZIONI E MANUTENZIONI INDUSTRIALI SRL - Costruzione, montaggio e saldatura di carpenteria metallica presso Officina della NUOVA IMPRESA COSTRUZIONI MANUTENZIONI INDUSTRIALI SRL sita in Macchiareddu Assemini (CA)
- CLIENTE NAVAL SOLUTION TECHNOLOGY SRL – Saldatura, costruzione ed assemblaggio tubi, montature e assitenza valvole presso la raffineria Q8 di Napoli;
- CLIENTE - DELTA IMPIANTI S.r.l. - Lavori di Saldatura, montaggi meccanici di tubazioni, carpenteria metallica presso nuovo impianto di trattamento e raffreddamento acque, Z.I. Rivoli Osoppo. (UD)
- CLIENTE - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Assembly and wielding Operations of Pipings Carpentry into SIAD Leopoldov - Slovik (Slovakia);
- CLIENTE - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Assembly and wielding Operations of Pipings Carpentry for the new plant of SIAD Belgioioso (PV);
- CLIENTE - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Pipings Assembly in Besana Brianza Plant (MB);
- CLIENTE - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Pre-manufacturing, Assembly and wielding operations of Piping for a Cold Box buillding in Marghera plant (VE);
- CLIENTE - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Pre-manufacturing, Assembly and wielding operations of Piping for a storing tank and Cold Box with respective pipings and supports wielding in Mozzanica Officina (BG);
- CLIENTE NMN NUOVA MECCANICA NAVALE - Pipings Pre-Manufacturing and Assembly on MSC Fabienne Ship in Naples harbor;
Former 2022 Projects:
- CUSTOMER - MAC IMPIANTI Srl - Tank Containers wielding in Saica Paper Papeteries yard, Laveyron (France).
- CUSTOMER - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Pre-manufacturing and Pipings assembly in IGAT factory of Pignataro Maggiore (CE).
- CUSTOMER - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Pipings and Mechanical compoments maintenance - Winter stop at Corteva Agriscience, Mozzanica. (BG)
- CLIENTE - TERMOMECCANICA ECOLOGICA (TM.E.) S.p.A. - Assembly Operation for a new Boiler Generator with all Piping-Tie-In lines and accessories, Biostoom Incinerator, Beringen (Belgium).
- CLIENTE - TERMOMECCANICA ECOLOGICA (TM.E.) S.p.A. - Piping Drenages Assembly into Burealis Refinery, Beringen (Belgium).
- CUSTOMER - MAC IMPIANTI Srl - Mechanical equipment mounting operations for the assembly and installation of turbines, RWE Generation SE Biblis (Germany).
- CUSTOMER - MAC IMPIANTI Srl - Structural and pre-heating conducts assembly in metal carpentry c/o Sycton Saint Ouen Incinerator - Paris.
- CUSTOMER - SAFAS Spa - Grinding, Smoothing and Wielding Operations of mechanical equipment at SAFAS yard and Foundry of Altavilla Vicentina, Vicenza.
- CUSTOMER - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. -Construction intervents of turbine box, supports and cold-box in Marghera. (VE)
- CUSTOMER - S.M.S. OPERATION S.r.l. - Assembly and wielding Operations of Pipings Carpentry into the Thermoelectric power plant of Turbigo (MI).
- CUSTOMER - DELTA IMPIANTI S.r.l. - Wielding operations, mechanical assembly of pipings and metal carpentry into the new water cooling treatment of Z.I. Rivoli Osoppo. (UD)
Former 2021 Projects:
- CUSTOMER - CARTUBI S.r.l. - Carpentry and wielding operations on the M/N Legends in convertion phase at Fincantieri di Palermo shipyard.
- CUSTOMER - MAC IMPIANTI S.r.l. - Pipings Modifications D3 Disperser service in Sappi yard of Carmignano del Brenta (PD)
- CUSTOMER - DELTA IMPIANTI S.r.l. - Pipings pre-manufacturing and assembly operation for a new compressed air plant and utilities network distribution at FANTONI Spa establishment in Z.I. Rivoli di Osoppo.(UD)
- CUSTOMER - MAC IMPIANTI S.r.l. - Mechanical Equipment Assembly int Syctom yard, Ivry Sur Seine. (France)
- CUSTOMER- CIVIDAC S.p.a. - Wielding and Assembly operations into Cividac workshops di San Biagio di Callalta. (TV)
- CUSTOMER - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Manufacturing and Installation of Carpentry onto NIPPON GASES implant, Gijon Asturias. (Spain)
- CUSTOMER - SEGEIT ENGINEERING S.r.l. - Montaggio di Piping e Saldatura per installazione nuovo forno nel Cantiere Mercegaglia, Ravenna.
- CUSTOMER - SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - Maintenance interventions into the Cordenpharma plant, Treviglio. (BG)
- CUSTOMER - DELTA IMPIANTI S.r.l. - DN600 lines assembly, Carpentry and cooling tower assembly in Acciaierie Venete di Trento, Borgo Valsugana. (TN)
- CUSTOMER - S.C.M SOCIETÀ COSTRUZIONI E MANUTENZIONE D.O.O. - Wielding Operations for installation and piping assembly, supports and general equipment
- CUSTOMER - MAC IMPIANTI Srl - Inox Steel wielding and assembly with relative supports, power supply piping system, storing tank and intake pipings into Lecta of Condat paper factory (Francia).
Former 2020 Projects:
- CUSTOMER - MAC IMPIANTI -TRONTANO (VB) Metal Carpentry-made Assembly and Wielding of Structural Conduit for the new Saint Ouen Incinerator, Paris (France);
- CUSTOMER - PALUMBO SPA - The Docks, Dwieli Rd Paola - Replacement Operation of:
- Hatch covers resting pads renewal work;
- Hatch covers deck twist lock steelworks;
- Hatch covers closing steelwork onto Maersk Kowloon, Malta ShipYard;
- CUSTOMER- RAVAGNAN S.p.a - Limena (PD) - Dismantling Operations, Pre-manufacturing and Assembly operations, Dust-Bag and Oven Pipings (both cold section and hot section) Wielding included at Acciaieria Valbruna S.p.a
. - CUSTOMER - DELTA IMPIANTI S.r.l. - Piping Assembly and Pump Unit Wielding operations, Acciaieria Sud Arvedi - Cremona
- CUSTOMER – LEONCINI SRL – Piping Assembly and Thermal Cycle Wielding of Biostoom Beringen Incinerator (Belgium)
- CUSTOMER - PALUMBO MALTA SHIPYARD ltd-- The Docks, Dwieli Rd Paola – Inox Steel 316L DN80 e DN50 Piping Pre-Manufacturing and Assembling for Air vent and Cooling system onto Jean Nicoli cruiseship.
- CUSTOMER - PALUMBO MALTA SHIPYARD ltd-- The Docks, Dwieli Rd Paola – Disassembling / Demolition and machinery assembly – Pre – manufacturing and cunifer/carbon based Piping Assembly – Pre-manufacturing and metal carpentry basement Assembly for support structure of Chilled and UTE machinery onto cruiseship Arctic;
- CUSTOMER - PALUMBO MALTA SHIPYARD ltd-- The Docks, Dwieli Rd Paola – Old railways disassembling – Pre-manufacturing and new DN50 new piping railways for fresh water – antifire DN25 system and air circulation onto Container Ship CMA CGM Tosca.
- CUSTOMER - PALUMBO SPA - The Docks, Dwieli Rd Paola - Disassembling work, Scrubber-Support Assembling - Corten/Duplex DE 1.100 Ferrules Pipings Assembling upper & lower lat of Scrubber - Disassembling and Inox Piping Press DE 54 and Inox Steel 312 DN 80 and Piping Assembling onto Pascal Paoli ship of Malta Shipyard;
- CUSTOMER - AXO CONSTRUCTION SRL - RAVENNA (RA) Pre-Assembly -Assembly, Piping Welding and Metal Structure Carpentry for TYRA Platform Project - CANTIERE ROSETTI MARINO SPA MARINA DI RAVENNA - (RA)
- CUSTOMER - PALUMBO SPA - Via Calata Marinella (interno porto) NA - Disassembling work, Pre-manufacturing and Steel-Carbon based Piping Assembling onto Cruise Olbia of Messina Shipyard;
- CUSTOMER - PALUMBO SPA - The Docks, Dwieli Rd Paola - Disassembling work, Oxi-Propane Cutting of Opening Section and Technical Closings for Bulkheads and Deck wit Tin-Wielding to Equipment Sector Access; Outboard Assembling; Sea Water Intakes and Structural Galvanized Canals; Pre-manufacturing and Piping Assembling onto Cruise Europa of Malta Shipyard;
Former 2019 Projects:
- CUSTOMER - PALUMBO SPA - The Docks, Dwieli Rd Paola - Fuel Lines Modifications, Drenages Systems and external dashboard washing; Disassembling and Pipings replacement onto Cruise Olympia Shipyard at Malta Shipyard;
- CUSTOMER - PALUMBO SPA - The Docks, Dwieli Rd Paola - Carbon Steel and Cunifer Piping System Modifications onto Cruise Olympia Tugboat of Malta Shipyard;
- CUSTOMER - INDEXA ITALIA 2 SRL - Piping Assembly and metal Welding for a Hitstop in November / December 2019 - CANTIERE CARTIERA BURGO SPA
- CUSTOMER - FLUID PIPING SRL - CASALNUOVO DI NAPOLI (NA) Demolition / Disassembly Cooling Furnace and Machines 11-12-13; Cooling, Assembly Machine 11-12-13 and c/o Glass Furnace c/o VETRERIE MERIDIONALI S.p.A. - Cantiere CASTELLANA GROTTE – BARI.
- CESTARO & ROSSI & C. S.P.A. – BARI Fermata 2019 – Pipings Assembly - cantiere RAFFINERIA ESSO AUGUSTA (SR);
- FOUR CLIMA SOC.COOP.ARL.NAPOLI Pre-Assembly and Pipings Assembly Ground DN350 Ground Level and DN250 Multifloor Section for the new pole of Naples Aeroporto Capodichino - cantiere Aeroporto Capodichino - Viale Comandante Umberto Maddalena – NAPOLI
- GRADED S.p.A.NAPOLI Pipings Welding DN350 ground floor DN250 Multifloor Section for the New Pole of Naples Aeroporto Capodichino cantiere Aeroporto Capodichino - Viale Comandante Umberto Maddalena – NAPOLI
- SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. - MOZZANICA (BG) Pipings pre-assembly and Sketch Carpentry - Officina di Mozzanica (BG).
- SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. Extraordinary Mechanic Manteinance - cantiere AVR AFVALVERWERKING B.V. Rivierwerg, 20 – 6921 PZ DUIVEN (OLANDA);
- SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. – SETTALLA (MI) Extraordinary Mechanic Manteinance - cantiere INDENA SPA – VIA DONMINZONI, 6 – 20090 SETTALA (MI).
- SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. Extraordinary Mechanic Manteinance cantiere – AIR LIQUIDE ITALIA PRODUZIONE SRL – VIA DANTE , – PIOLTELLO - MILANO (MI).
- MAC IMPIANTI SRL - TRONTANO (VB) Pipings Assembly and Metal Carpentry - cantiere WIDMERPOOL NOTTINGHAM NG 125 PS.
- MAC IMPIANTI SRL - TRONTANO (VB) Pipings Assembly cantiere CNIM AVONMOUTH – BRISTOL (UK).
- MAC IMPIANTI SRL - TRONTANO (VB) Pipings Assembly and Metal Carpentry for the New Incinerator Saint Ouen Parigi (Francia).
- MAC IMPIANTI SRL - TRONTANO (VB) Pipings Assembly and Metal Carpentry - cantiere BIOSTOOM 3583 BERINGEN RAVENSHOUT 7.1 INDUSTRIEWEG 170. (BELGIO)
- SIMIND COSTRUZIONI E MONTAGGI IMPIANTI INDUSTRIALI S.r.l. Pipings Maintenance for a new plant - cantiere – AIR LIQUIDE ITALIA PRODUZIONE SRL – VIA DANTE , – PIOLTELLO - MILANO (MI).
Former 2018 Projects:
- Fincimec Spa MILANO Maintenance Work (Piping and Supports Manufacture and Assembly) presso F.I.S. Spa sita in ALMISANO Lonigo (VI).
- FINCIMEC Spa Milano Lavori di Manutenzione (Piping and Supports Manufacture and Assembly) presso F.I.S. Spa sita in MONTECCHIO (VI).
- IREM NETHERLANDS BRANCH (GRUPPO IREM Spa - SIRACUSA) Piping and Supports Manufacture and Assembly - cantiere raffineria Exxon Mobil Botlekweg BOTLEK ROTTERDAM (OLANDA).
- IREM Spa - SIRACUSA Pipings and Supports Assembly presso il cantire Impianto Stoccaggio Gas D021 - CORNELAGNO LAUDESE (LODI).
- TECNOMEC ENGINEERING SRL Grumo Appula (BA) Pipings Manufacture and Metal Carpentry - cantiere Raffineria ENI Sannazaro Dè Burgondi.
- MAC IMPIANTI SRL - TRONTANO (VB) Pipings and Metal Carpentry Assembly - cantiere nuovo Inceneritore Saint Ouen Parigi (Francia).
- MAC IMPIANTI SRL - TRONTANO (VB) Stop Mark 2018 Disassembly and Assembly Metal Structure and Pipework - cantiere PLASTIPAK - PALLANZA(VB).
- BELMONT SRL – Fermata 2018 - Equipment Maintenance (Heat exchanger and Columns) -Raffineria Isab sita in Via Litoranea Priolese – PRIOLO GARGALLO
Former 2017 Projects:
- Fincimec Spa MILANO Pipings and Supports Assembly for n°2 200 MW Boilers presso il cantiere raffineria PETROINES sita in Laverà Martigues (FRANCIA).
- LTN SRL Piping and Supports Manufacture and Assembly for a new Gas Pipeline DN250 - cantiere deposito costiero GPL Italcost srl Napoli.
- SIMI SUD Acquaviva Piena (AP) Piping and Supports Manufacture and Assembly for a new Gas Pipeline DN250 - cantiere Deposito Costiero GPL Italcost srl Napoli.
- IREM NETHERLANDS BRANCH (GRUPPO IREM Spa - SIRACUSA) Pipings and Supports Assembly - cantiere raffineria Exxon Mobil Botlekweg BOTLEK ROTTERDAN (OLANDA)
CAREERS
Wanna work with us?
Send us your CV which helps you present your skills and qualifications in a clear and effective way.
Click on the following links to fill in the form in Europass model:
- Create your Curriculum Vitae (click o link)
- Update your Curriculum (click on link)
- Example (click on link)
For every business inquiries, careers regarding question, send us a mail to info@pipingstechnologies.com